[1] |
.
循环冲击;动载;充填体(CTB);力学特性;SHPB
[J]. Journal of Mining & Safety Engineering, 2019, 36(1): 184-190.
|
[2] |
.
Mechanical analysis of roof separation within and outside anchorage zone above backfill area of gob-side entry retaining and its engineering application
[J]. Journal of Mining & Safety Engineering, 2018, 35(5): 893-901.
|
[3] |
.
Study on ultimate filling pace of backfill mining with slurry swelling compound material
[J]. Journal of Mining & Safety Engineering, 2018, 35(5): 991-996.
|
[4] |
.
Structure stability analysis and control technology of surrounding rock of the secondary gob-side entry retaining
[J]. Journal of Mining & Safety Engineering, 2018, 35(5): 877-884.
|
[5] |
.
[J]. Journal of Mining & Safety Engineering, 2018, 35(3): 612-.
|
[6] |
.
Research on overlying strata structure and ground control
in transition area of fully mechanized mining working face
[J]. Journal of Mining & Safety Engineering, 2018, 35(1): 86-93.
|
[7] |
LI Meng,ZHANG Jixiong,HUANG Yanli,ZHANG Qiang.
Research on compression ratio design based on compaction properties of solid backfill materials
[J]. Journal of Mining & Safety Engineering, 2017, 34(6): 1110-1115.
|
[8] |
LI Changhong,WEI Xiaoming,ZHANG Lixin,ZHOU Xiaolong,WANG Xiaonan,XU Min.
Energy matching relationship between cemented backfill body and ore and determination of curing time
[J]. Journal of Mining & Safety Engineering, 2017, 34(6): 1116-1121.
|
[9] |
.
Theoretical feasibility study on backfilling with gangue in close low protective seam mining
[J]. Journal of Mining & Safety Engineering, 2017, 34(5): 838-844.
|
[10] |
SUN Xikui,ZHAO Qingmin,SHI Xianyuan.
Research and application on the technology of paste backfilling fully mechanized in residual strip pillar
[J]. Journal of Mining & Safety Engineering, 2017, 34(4): 650-654.
|
[11] |
.
Coupling mechanism of rock-backfill system under triaxial compression
[J]. Journal of Mining & Safety Engineering, 2017, 34(3): 573-579.
|
[12] |
.
The ratio parameter design and engineering optimization of high stage delayed cemented backfill
[J]. Journal of Mining & Safety Engineering, 2017, 34(3): 580-586.
|
[13] |
WU Rui,XU Jinhai,ZHAO Kui,LI Haigang.
Deformation characteristics and control of the surrounding rock in roadways with pre-backfill instead of the pillar in fully mechanized working faces
[J]. Journal of Mining & Safety Engineering, 2017, 34(2): 221-227.
|
[14] |
ZHANG Wen,LIAN Minjie,REN Fengyu,GUO Jinping,SHI Guangbin,WANG Zhao.
Action mechanism of the filling body in the upward-to-horizontal slice stoping-filling method with pointed pillars and shape optimization of pointed pillar
[J]. Journal of Mining & Safety Engineering, 2017, 34(2): 295-301.
|
[15] |
QI Tingye,FENG Guorui ,ZHANG Xinjun,YU Chuantao,LIU Hongfu,KANG Lixun .
The application of resistivity evaluating filling effect method in Xinyang coal mine
[J]. Journal of Mining & Safety Engineering, 2017, 34(2): 302-309.
|