锚喷支护软岩大巷混凝土喷层受力监测与分析

  

  1. 1.煤炭科学研究总院开采设计研究分院,北京  100013;
    2.天地科技股份有限公司开采设计事业部,北京  100013;
    3.中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏  徐州  221008
  • 收稿日期:2011-11-22 出版日期:2012-11-15 发布日期:2012-11-05
  • 作者简介:方树林(1987-),男,安徽省枞阳县人,硕士,从事巷道矿压理论与支护技术方面的研究。 E-mail:fsl_cumt@126.com Tel:010-84262912
  • 基金资助:

    国家高新技术研究发展计划(863)项目(2008AA062102);
    深部岩土力学与地下工程国家重点实验室开放基金项目(SKLGDUEK1007)

Mechanical Monitoring and Analysis on Shotcrete Layer of Soft Rock Main Roadway Supported

  • Received:2011-11-22 Online:2012-11-15 Published:2012-11-05

摘要: 针对塔然高勒煤矿总回风大巷软弱、淋水、难维护的困难条件,设计了高预应力强力锚喷支护方案,并采用振弦式混凝土应力计对该方案实施于井下后混凝土喷层的受力状态进行了监测。监测结果表明,喷层内部在轴向、径向和切向会产生应力,外部与围岩表面及先喷混凝土层接触会产生接触压力;3个方向的内应力在时间上呈现波动变化并趋向稳定的特点,在空间上呈现拱顶→拱腰→墙腰逐渐增大、墙脚有所降低,左右对称,分布均匀的特点,在大小上以切向应力最大、径向和轴向应力次之,平均应力值分别为0.517,0.043,-0.059 MPa,在性质上轴向应力以受拉为主、径向和切向应力以受压为主;外部接触压力均为压应力,随时间存在一个先逐步增大后保持稳定的发展过程,空间上沿着巷道断面周边从上往下逐渐增大且左右不对称,在大小上喷层与喷层的接触压力比喷层与围岩的接触压力要小,两者平均值分别为0.266,0.648 MPa。巷道掘进期间,喷层受力小于其极限承载能力,混凝土变形有限,说明高预应力强力锚喷支护技术满足塔然高勒煤矿总回风大巷围岩控制要求。

关键词: 高预应力强力锚喷支护, 软岩巷道, 喷层, 受力监测

Abstract: Based on the soft rock,water-trickling and hard-maintain difficulty conditions of main air-return roadway in Tarangaole Colliery,high pretension stress and intensive bolt-shotcrete support program was designed. Mechanical property of shotcrete layer was specially monitored through utilizing concrete stress meter with a type of oscillating chord after the program was carried out in the roadway. It is indicated that the interior of shotcrete layer will emerge diverse stresses in axial,radial and tangential direction, and that its exterior will emerge contact pressures when the shotcrete layer gets in touch with surrounding rock and the earlier layer. With time prolonged,internal stresses in three directions whose average values were 0.517 MPa,0.043 MPa and -0.059 MPa respectively have been fluctuated and tended to stability. Nevertheless,two kinds of external contact pressures which were all compressive increased earlier and remained stable lately while contact pressures of layer-surrounding rock were up to 0.266 MPa and those of layer-layer were up to 0.648 MPa averagely. Spatially,along the section of roadway,all of internal stresses distributed symmetrically and increased gradually from the top of arch to the waist of wall,but stresses in the foot of wall reduced partly with bilateral symmetry. However,external contact pressures increased gradually from top to bottom and distributed unevenly along the surrounding of roadway. During the period of roadway excavating,the stress of shotcrete layer was less than its ultimate bearing capacity, and the deformation of shotcrete was limited. The two aspects show that high pretension stress and intensive bolt-shotcrete support technology meet the surrounding rock control requirement of main air-return roadway in Tarangaole Colliery.

Key words: high pretension stress and intensive bolt-shotcrete support, soft rock roadway, shotcrete layer, mechanical property measurement