Journal of Mining and Safety Engineering ›› 2020, Vol. 37 ›› Issue (4): 741-749.doi: 10.13545/j.cnki.jmse.2020.04.12

Previous Articles     Next Articles

Caving height prediction of caving method based on time-delay nonlinear mgm model

  

  • Online:2020-07-15 Published:2020-08-11

CLC Number: