Journal of Mining and Safety Engineering ›› 2025, Vol. 42 ›› Issue (3): 660-672.doi: 10.13545/j.cnki.jmse.2024.0522

Previous Articles     Next Articles

Reference phase retrieve and PIM fusion monitoring method for InSAR three-dimensional deformation in large gradient deformation mining areas

  

  • Online:2025-05-15 Published:2025-05-21

CLC Number: