Journal of Mining & Safety Engineering ›› 2012, Vol. 29 ›› Issue (1): 111-117.
Previous Articles Next Articles
Received:
Online:
Published:
Abstract: Taking the fully mechanized caving face 15101 in Xindadi coal mine,Shanxi province as the research object,we have studied the strata movement rules of the face and the characteristics of pressure-relief gas drainage in adjacent seam,determined the arrangement principle of layer-through boreholes in face 15101.In addition,6 optimization schemes were proposed,and the associated numerical simulations were conducted by using FLUENT.According to simulation results,the optimal arrangement parameters of layer-through boreholes in adjacent seam were determined finally.The results show that the vertical height of final hole to the floor of 15# coal seam is 50 m,and the horizontal distance of final hole is 20 m deep into the face.After the parameter optimization,the gas extraction of adjacent seam in face 15101 has obtained a favorable effect,and the average gas extraction quantity is up to 51.8 m3/min.
Key words: layer-through borehole, gas extraction, CFD simulation, green mining
QIN Wei, XU Jia-Lin, WU Ren-Lun, HU Guo-Zhong, WANG Zhong-Wei, TIAN Gen-Wan. Gas Extraction Optimum Design of Layer-Through Borehole in Adjacent Seam Based on CFD Simulation[J]. Journal of Mining & Safety Engineering, 2012, 29(1): 111-117.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://ckxb.cumt.edu.cn/EN/
http://ckxb.cumt.edu.cn/EN/Y2012/V29/I1/111