Gas Extraction Optimum Design of Layer-Through Borehole in Adjacent Seam Based on CFD Simulation

  

  • Received:2011-02-18 Online:2012-01-15 Published:2011-12-14

Abstract: Taking the fully mechanized caving face 15101 in Xindadi coal mine,Shanxi province as the research object,we have studied the strata movement rules of the face and the characteristics of pressure-relief gas drainage in adjacent seam,determined the arrangement principle of layer-through boreholes in face 15101.In addition,6 optimization schemes were proposed,and the associated numerical simulations were conducted by using FLUENT.According to simulation results,the optimal arrangement parameters of layer-through boreholes in adjacent seam were determined finally.The results show that the vertical height of final hole to the floor of 15# coal seam is 50 m,and the horizontal distance of final hole is 20 m deep into the face.After the parameter optimization,the gas extraction of adjacent seam in face 15101 has obtained a favorable effect,and the average gas extraction quantity is up to 51.8 m3/min.

Key words: layer-through borehole, gas extraction, CFD simulation, green mining