Journal of Mining & Safety Engineering ›› 2013, Vol. 30 ›› Issue (5): 761-765.

Previous Articles     Next Articles

Study on application scope of stripping semi-continuous system in internal dumping open pit mine

  

  • Online:2013-09-15 Published:2013-10-01

Abstract: Based on the analysis of overburden internal dumping distance in the open pit mine, this article establishes the optimization model of mining system, and provides support for the research on application scope optimization of stripping semi-continuous system. According to the characteristics of flat dipping open-pit mining, this article gives the calculation methods of overburden internal dumping distance in the shovel-truck discontinuous system and semi-continuous system. Based on comprehensive consideration of investment and operation cost effect, open pit mining system optimization model is established with the objective of minimum total cost in calculation period, and gives the calculation method of investment, stripping system operation cost and the additional costs, and the boundary conditions of semi-continuous application. The case study shows that with the increasing of mining depth and pit size, the application of semi-continuous system in upper stripping bench is reasonable, and the service range of the stripping semi-continuous system in H Mine is more than +140m level. Sensitivity analysis of fuel costs shows that the rapid rise of diesel prices in China will popularize the application of stripping semi-continuous system in large open pit coal mine.

Key words: semi-continuous system, open pit mine, stripping, internal dumping