Journal of Mining and Safety Engineering ›› 2024, Vol. 41 ›› Issue (5): 982-989.doi: 10.13545/j.cnki.jmse.2023.0324

Previous Articles     Next Articles

Analysis of anchor cable grouting and repair control in deep roadway

  

  • Online:2024-09-15 Published:2024-09-14

CLC Number: