Journal of Mining and Safety Engineering ›› 2025, Vol. 42 ›› Issue (1): 218-228.doi: 10.13545/j.cnki.jmse.2022.0678

Previous Articles     Next Articles

Calculation model of roof span and thickness of goaf under high stage backfill considering arch effect

  

  • Online:2025-01-15 Published:2025-01-18

CLC Number: