Mechanics Analysis on the Stability of Key Block in the Gob-side Entry Retaining and Engineering Application

  • Received:2011-10-04 Online:2012-05-15 Published:2012-04-12

摘要: 由于巷旁充填初期充填体承载能力较低,保持沿空留巷期间工作面端头关键块的稳定至关重要。通过建立沿空留巷关键块结构力学模型,基于关键块滑落失稳及挤压变形失稳的判别条件,推导出巷旁支护阻力的计算公式。以淮南谢一矿512(5)工作面机巷作为工程背景,研究了煤帮支护阻力、巷内支护阻力、巷旁支护阻力及充填体宽度对关键块的稳定性影响。研究结果表明,巷内支护采用具有较高主动支撑力的支护,煤帮采用高预应力、高强度锚杆加固,以及巷旁支护选用早期强度高、增阻速度快的充填材料,有利于提高关键块的稳定性。在获得以上研究结果的基础上,对512(5)工作面机巷沿空留巷支护参数进行设计。工程实践表明,采用锚带网索巷内基本支护、巷内分区分级加强支护及膏体材料泵送充填工艺系统是合理可行的,在巷内支护阻力不低于0.15 MPa,巷旁支护阻力不低于3.5 MPa的条件下,充填体宽度取2.5 m能够保证沿空留巷期间关键块的稳定。

关键词: 沿空留巷, 关键块稳定性, 巷旁支护阻力, 充填体宽度

Abstract: Due to the low bearing capacity of roadside backfill in the early stage of roadside backfilling, it is critical to maintain the stability of key block at the face end during roadside backfilling. In this paper, based on the criterions of slip instability and rotation instability, the formula of roadside support resistance is derived, through establishing the mechanical model of key block structure in the gob-side entry retaining. Taking headentry of No.512(5) mining face as project background, we have studied the effects of roadside coal support resistance, roadway-inside support resistance, roadside support resistance and width of roadside backfill on the stability of key block. The results show that it is beneficial to improve the stability of key block, when using high active supporting force in roadway-inside support, high pre-stressed, high-strength bolting in roadside coal support, and adopting the backfilling materials with high strength and quickly increased resistance at early stage in roadside support. Based on the study results mentioned above, the supporting parameters of gob-side entry retaining in the headentry of No.512(5) face are designed. The engineering practices show that, it is reasonable and feasible to adopt combined support with bolting, cable and wire mesh as the basic supporting in roadway-inside, use different strengthening supporting in different zones of roadway-inside, and choose backfilling process system of pumping quick-setting materials of high water in roadside supporting. The stability of key block during the gob-side entry retaining can be ensured when the support resistances of roadway-inside and roadside are not less than 0.15 MPa and 3.5 MPa, respectively, with the width of roadside backfill is 2.5 m.

Key words: the gob-side entry retaining , the stability of key block , roadside support resistance, the width of roadside backfill