采矿与安全工程学报 ›› 2013, Vol. 30 ›› Issue (5): 642-647.

• 论文 • 上一篇    下一篇

预掘两巷前进式固体充填采煤技术研究

  

  1. 中国矿业大学矿业工程学院,深部煤炭资源开采教育部重点实验室,江苏徐州 221116
  • 出版日期:2013-09-15 发布日期:2013-10-01
  • 作者简介:周楠(1988-),男,安徽省宿州市人,博士,从事固体充填开采与岩层控制等方面的研究。 E-mail:zhounanyou@126.com Tel:13813458656
  • 基金资助:

    教育部新世纪优秀人才支持计划项目(NCET-11-0728);国家自然科学基金项目(51074165);江苏省普通高校研究生科研创新计划项目(CXZZ12_0952)

Advancing solid backfill mining on condition of two entries pre-excavation

  • Online:2013-09-15 Published:2013-10-01

摘要: 针对部分“三下”压煤区域地质条件及已存在巷道系统的限制问题,为保证固体充填开采之后对岩层移动及地表变形的控制效果,提出了预掘两巷前进式固体充填采煤技术,分析了该技术的原理及难点,建立了预掘两巷前进式固体充填系统、优化了充填采煤关键设备结构及布置方案,设计了固体充填采煤无煤柱沿空留巷方案及工艺,优化了充填采煤与沿空留巷一体化工艺。现场实践表明,预掘两巷前进式固体充填采煤技术可有效控制岩层移动与地表变形,采空区充实率达90.6%,无煤柱沿空留巷断面保持在原断面的90%以上,地表最大下沉值125 mm,可安全高效地开采类似条件“三下”压煤资源。

关键词: 预掘两巷, 前进式开采, 固体充填采煤, 沿空留巷, 充实率

Abstract: Restricted by geological conditions and existing roadways layout of some mining area under buildings, railways, and water bodies, to guarantee the controlling effect of solid backfill mining to strata movement and ground deformation, the article proposed solid backfill mining technology on condition of two entries pre-excavation, analyzed its principle and the technical difficulties, established advancing solid backfill mining system on condition of two entries pre-excavation, optimized key equipment structure for backfill mining and corresponding layout, and designed an integrated technique and a comprehensive system based on the technical features of both solid backfill mining and gob-side entry. On-site practice shows that the filling ratio of 90.6% is achieved, the cross section of the retained entries account for more than 90% of the original one, and the maximal sinking value of the ground is 125 mm, which prove this technology can effectively control the strata movement and ground deformation. This integrated technology shows a great potential for excavating the coal resource under similar conditions.

Key words: two entries pre-excavation, advancing mining, solid backfill mining, gob-side entry retaining, filling ratio