采矿与安全工程学报 ›› 2014, Vol. 31 ›› Issue (1): 146-153.

• 论文 • 上一篇    下一篇

深立井过瓦斯抽排孔群扰动煤岩层损伤评估与支护优化

  

  1. 1.安徽理工大学土木建筑学院,安徽 淮南 232001;2.安徽大学资源与环境工程学院,安徽 合肥 230601;3.淮北矿业集团公司海孜煤矿,安徽 淮北 235000
  • 出版日期:2014-01-15 发布日期:2014-02-26
  • 作者简介:黎明镜(1985-),男,安徽省宿松县人,博士,从事矿山压力与岩层控制方面的研究。 E-mail:lmj201007@126.com Tel:18297610980
  • 基金资助:

    国家自然科学基金项目(50874002)

Damage evaluation and support optimization of deep vertical shaft through the coal and rock seams disturbed by array gas-discharging holes

  • Online:2014-01-15 Published:2014-02-26

摘要: 针对深立井过受瓦斯抽排孔群扰动的煤岩层工程安全问题,分析了钻孔群对煤岩层的扰动影响,基于损伤力学理论建立了定量的扰动损伤评估模型,对淮北海孜煤矿千米立井过受瓦斯抽排孔群扰动煤岩层的稳定性及井筒掘砌过程进行了数值模拟,根据分析结果优化了受扰动煤岩层的加固与井筒掘砌支护方案。研究结果表明:瓦斯抽排钻孔群对煤岩层的扰动评估应综合考虑钻孔水“冲刷效应”、煤岩体“卸压效应”及“孔群效应”,3种效应相互作用使得煤与软弱泥岩受损程度远大于稳定粉砂岩层;煤与软弱泥岩层受瓦斯抽排孔扰动后易于出现大范围失稳;井筒掘砌过相应扰动层位前,可利用瓦斯抽排孔进行预注浆加固受损围岩,通过加强掘进初期支护、提高井壁混凝土抗拉性能及壁后注浆等综合措施确保围岩稳定与支护安全。

关键词: 突出煤岩层, 瓦斯抽排孔群, 损伤评估, 井壁

Abstract: Aiming to ensure the security of deep vertical shaft through the coal and rock seams which are disturbed by array gas-discharging holes, the disturbing mechanism is analyzed, and a damage evaluation model is established based on the damage mechanics theory. Then, the stability of disturbance coal and rock seams, mechanical response of rock excavation and shaft lining placement are simulated by numerical method specific to a km deep vertical shaft in Haizi coal mine. Based on the analysis result, support scheme of deep vertical shaft through the coal and rock seams disturbed by array gas-discharging holes is optimized. Results show that, to evaluate the damage of coal and rock seams disturbed by array gas-discharging holes, the erosion action of water in drill hole, pressure-relief and ar- ray holes effect of coal and rock seams should be considered at the same time, as the integrating of the three effect causes a larger damage of coal and mudstone stratum than the siltstone stratum. Disturbed coal and mudstone stratum is apt to be unstable in a great range. In order to ensure the stability of surrounding rock and support, firstly, before the vertical shaft pass through the relevant strata, gas-discharging holes are used in pre-grouting to reinforce the surrounding rock; secondly, during the excavate and pouring process of shaft lining, some strengthened initial support is constructed in time, and the tensile properties of shaft lining concrete is improved; thirdly, after the shaft lining pass through the disturbed strata, the surrounding rock is reinforced by backfill grouting in time.

Key words: gas outburst coal seam and strata, array gas-discharging holes, damage evaluation, shaft lining