采矿与安全工程学报 ›› 2014, Vol. 31 ›› Issue (3): 424-429.

• 论文 • 上一篇    下一篇

无煤柱开采保护层实现倾向连续、充分卸压的实验研究

  

  1. 中国矿业大学(北京)资源与安全工程学院,北京 100083
  • 出版日期:2014-05-15 发布日期:2014-05-20
  • 作者简介:王志强(1980-),男,内蒙古自治区呼伦贝尔市人,博士,讲师,硕士生导师,从事采矿技术与长壁工作面矿山压力方面的研究。 E-mail:wzhiqianglhm@126.com Tel:13810796225
  • 基金资助:

    中央高校基本科研业务费专项资金项目(2011QZ06)

Experimental research on realizing inclined successive and sufficient pressure-relief in pillarless protective coal seam mining

  • Online:2014-05-15 Published:2014-05-20

摘要: 研究基于实现被保护层倾向充分、连续卸压的下保护层开采展开。分析与实验表明,保护层工作面长度、层间距、卸压边界线与留设煤柱造成的远距离被保护层倾向无法实现卸压、近距离被保护层倾向存在高应力区域或者卸压不充分区域,无法实现被保护层倾向的安全、连续开采。在此基础上,提出使用无煤柱布置被保护层回采工作面,接续工作面回采时上覆岩层的运动与首采工作面形成一个整体,实现了倾斜方向的连续开采长度,覆岩的采动程度更加充分,被保护层在裂隙带中的层位相对降低,卸压程度更加充分,因此无煤柱开采实现了被保护层倾向的充分、连续卸压。结合实际工程背景,综合回采率和巷道工程量考虑,煤2采用无煤柱开采方案比原方案增加回采利润2.84亿元;与5 m小煤柱沿空掘巷相比,减少岩巷工程费用计600万元,增加回采利润1.4亿元。

关键词: 突出煤层, 卸压, 下保护层, 煤柱, &ldquo, 三带&rdquo

Abstract: The research in this paper was conducted based on realizing inclined sufficient and successive pressure-relief in lower protected coal seam mining. The results show that due to the length of coal face, interval between layers, borderline of pressure-relief and coal pillar layout, the pressure-relief in the inclination of the distant protected coal seam can’t be realized, and the high stress zones or insufficient pressure-relief zones may exist in the close protected seam. The safe and successive mining of protected seam can’t be realized. On this basis, the pillarless face layout in protected seam was proposed. Thus, the overlying strata movement during the successive face mining may integrate with that of the first mining face, the inclined successive mining length can be enlarged, and the mining degree of the overburden strata is more sufficient. So, the horizon of the protected seam in the fractured zone is relatively lower, which means the pressure- relief degree is more sufficient. Hence the inclined successive and complete pressure-relief in the protected coal seam can be realized. Combined with the practical engineering conditions in one mine, taking recovery ratio and engineering amount of roadway into consideration, the profit of No.2 Coal Seam mining when adopting pillarless mining is increased by 284 million yuan compared with the original mining plan. Morevoer, compared with the roadway driving along the goaf remaining 5-metre pillar, the engineering expense of rock roadway can be reduced by 6 million, and the mining profit can be increased by 140 million.

Key words: outburst coal seam;pressure relief;lower protective seam;coal pillar;&ldquo, three zones&rdquo